Ready to Protect Your Margins? See Your Rework Savings

Calculate how strong QA processes reduce rework. See how much you can save with PlanRadar.

Your project profile

Select your construction project category:

Housebuilding

Housebuilding

General Contracting

General Contracting

type

Type of development

Select your development type

currency

Currency

Select your project currency

Project Details

Provide key project specifications

Number of Plots

+

Average Size per Plot (m²)

+

Average Number of Snags per Plot

+

Build phase

Current project phase / At which stage would you start using PlanRadar?

Average cost to fix a snag

UK average is £80 per snag

£
+
type

Type of development

Select your development type

currency

Currency

Select your project currency

Project details

Provide key project specifications

Total Area (m²)

+

Current Snags per 100m²

+

Number of Projects

+

Build phase

Current project phase / At which stage would you start using PlanRadar?

Average cost to fix a snag

UK average is £80 per snag

£
+
icon

You’re building plots of , each with an average of snags per plot.

You’re building of , each with an average of snags per 100m².

With PlanRadar, you could reduce snags by , avoiding over issues and saving around in rework costs.

icon

Potential annual savings

Snag reduction

Issues avoided

Discover how a tailored QA strategy can reduce rework and deliver savings on your projects.

Get My Results

Receive a shareable summary of your results

Something went wrong! Please refresh

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Book a QA Strategy Call

Speak with our quality experts about implementing these savings

What you’ll get:

  • Personalised quality strategy tailored to your projects
  • A rollout plan with on-site quick wins
  • Proven outcomes from industry peers
  • Technology recommendations & ROI projections

30-minute consultation • No obligation

Book your free call

Trusted by over 170,000 users across 75+ countries

Disclaimer: The figures in this calculator are estimates based on industry research (CII, GIRI, McKinsey) and typical snag costs (which you can edit). Actual results will vary depending on your project type, size, and QA/QC practices.

Your savings are based on industry benchmarks for rework and snag reduction:

  • Total snags projected → Calculated from the average number of snags per property type × the number of units in your project.
  • Phase of project → The earlier you start using PlanRadar, the greater the reduction potential:
  • Pre-construction (60–70%) – Most defects prevented at source.
  • Early build (50–60%) – Major structural/M&E issues caught before finishes.
  • Late build (30–40%) – Finishes and handover defects reduced.
  • Post-handover (10–20%) – Warranty callbacks reduced.
  • Snags avoided → Projected snags × reduction % based on your selected build stage
  • Savings (£) → Snags avoided × average cost to fix a snag (editable by you).

Research shows rework can add 5–15% to project budgets (CII, GIRI). Strong QA/QC processes throughout the project prevent many of these costs.