Customer Story

We are probably 90% faster in setup, what used to take hours or sometimes days in BlueBeam to get set up correctly is now done within 10–15 minutes.

Mayur Ragha,

Director of IT

About Horizon Construction Group

Horizon Construction Group, Inc. has been a Midwest leader in multifamily residential construction since 1984, growing into a $400 million company while staying true to its core values of quality, integrity, and community.

To elevate speed and quality, Horizon adopted PlanRadar to streamline punch list and warranty workflows. Since implementing the platform, Horizon has increased punch list efficiency by nearly 40%, enabling its teams to deliver high-quality projects on time with greater clarity and consistency.

The challenge

As Horizon’s project volume grew from roughly five projects a year to 15–20, its punch list and warranty processes struggled to keep pace. Manual processes and paper-based habits that had worked at a smaller scale started to create friction across the field team.

Slow punch list setup: Punch items were tracked in Bluebeam, a process teams described as slow and difficult to set up correctly, often taking hours or days per building. Plans also had to be manually clipped and relabeled unit by unit before a punch list could be created, adding hours of administrative work before the fieldwork began.

Limited information for subcontractors: Subcontractors relied on blue tape and printed reports left on-site, with no attached photos or written detail. This left them to interpret what needed fixing and often led to rework.

Field reporting bottlenecks: Field reports were compiled by office staff or project engineers rather than superintendents, creating a bottleneck between the site and the people who needed the data.

Increasing warranty complexity: As warranty claim volume grew alongside the project pipeline, tracking claims across spreadsheets and legacy tools became harder to manage and increasingly fragile.

 

The solution

PlanRadar gave Horizon a single platform to replace the fragmented mix of Bluebeam, blue tape, and paper reports across punch and warranty work.

Fast adoption across the field team: Adoption came faster than Horizon expected across a field team spanning multiple generations of technology comfort. Superintendents accustomed to flip phones picked it up as quickly as newer hires, cutting the ramp-up time and adoption risk that usually comes with rolling out new field software.

“It was simplified, it was mobile, it was in their hand. I need it to be intuitive, fast and easy to learn. In our test, within five minutes, our individual who uses technology at a very limited capacity had gotten grasp of it. To me that was key because that allowed us to adopt quickly across all our jobs.”

— Mayur Ragha, Director of IT

Clear, documented punch items: Punch items now require a pinned location and attached photos or video, giving subcontractors clear, documented instructions.

Superintendents can review and approve completed punch items remotely, using required photo documentation rather than a physical walkback to the unit. Rejections come with the same level of detail, so subcontractors know exactly what to fix without back-and-forth clarification.

One standardized warranty process: On the warranty side, PlanRadar replaced spreadsheets and legacy tools with one standardized intake process. Claims are tracked centrally rather than across scattered files, giving Horizon a single structured workflow as claim volume grew alongside its project pipeline.

“Transitioning to PlanRadar was actually an easier process than I anticipated it was going to be. It acts in a more intuitive way for our field staff, so the training component was a little bit faster than I thought it was going to be.”

— Joe Herfel, General Field Supervisor, Horizon Construction Group

The results

Since adopting PlanRadar, Horizon has seen measurable gains in speed, scale, and team efficiency across punch and warranty workflows.

Punch list efficiency increased by nearly 40%: A 20-unit building that used to take a full day of punch work now takes four to five hours.

“Our old process took our teams somewhere between 6 to 8 hours to get done 15 to 20 units of punch … it used to be a whole day process just to get the items into the system, labeled correctly, assigned correctly, and then get the publish out. With PlanRadar, we can cut that time almost in half and get 20 units done in 4 to 5 hours.”

— Joe Herfel, General Field Supervisor

Punch setup became approximately 90% faster than Bluebeam: Work that used to take hours or days to set up correctly now takes 10–15 minutes.

“We’re probably 90% faster in setup. What used to take hours or sometimes days in Bluebeam to get set up correctly is now done within 10–15 minutes.”

— Mayur Ragha, Director of IT

Live with field staff within half a day: Implementation and onboarding moved fast enough that Horizon was running PlanRadar with its field team on its very first job within half a day.

“We were up and running with PlanRadar with our field staff on our very first job within a half a day.”

— Mayur Ragha, Director of IT

More than 100 warranty claims managed each month: As Horizon scaled from roughly five projects a year to 15–20, PlanRadar enabled the warranty team to absorb the volume increase without adding headcount.

“The same team size can handle over 100 claims per month without the need to scale headcount.”

— Angie Hubeler, Construction Coordinator

Site revisits reduced by 15–20%: Remote review and approval of punch items means fewer physical walkbacks to verify completed work.

 

As Horizon continues to grow, PlanRadar remains a key part of how the company keeps punch and warranty work fast, consistent, and easy for every generation of its field team to adopt. With that foundation in place, Horizon is positioned to take on more projects without losing the speed or quality its clients expect.